Year End Review 2024: Department of Rural Development

MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA)

Objectives:

  • Provide 100 days of unskilled manual work annually to rural households
  • Strengthen livelihood resources of the poor
  • Ensure social inclusion
  • Strengthen Panchayati Raj Institutions

Key Achievements (FY 2024-25):

  1. Person-days Generated: 196.30 crore
  2. Total Central Release: ₹77,491.29 crore
  3. Women Participation: 57.86%
  4. ST/SC Person Days: 36.91%
  5. Works Completed: 61.29 lakh
  6. FTO Generation within 8 days: 97.18%

Major Technological Initiatives:

  1. National Mobile Monitoring Service (NMMS)
  • Records attendance at worksites
  • Geo-tagged photographs twice daily
  • 96% attendance capture in November 2024
  1. Area Officer Monitoring App
  • 8.83 lakh worksites inspected in FY 2024-25
  • Facilitates online field visit records
  • Geo-tagged photographs of visited sites
  1. GIS Integration
  • GIS plans prepared for 2.65 lakh Gram Panchayats
  • Yuktdhara portal developed with ISRO-NRSC
  • GeoMGNREGA: 6.13 crore assets geo-tagged
  1. JALDOOT App
  • Measures water levels in wells
  • 5.84 lakh wells monitored
  • Covers 2.57 lakh villages

PRADHAN MANTRI AWAAS YOJANA – GRAMIN (PMAY-G)

Objective: “Housing for All” in rural areas

Current Status (as of Dec 2024):

  1. Total Houses:
  • Sanctioned: 3.22 crore
  • Completed: 2.68 crore
  • First installment released: 3.04 crore
  1. 2024 Achievements:
  • Houses sanctioned: 28,17,022
  • First installment released: 22,97,880
  • Completed: 54,582

New Initiatives:

  1. Extended target: Additional 2 crore houses by 2028-29
  2. Income criteria enhanced to ₹15,000 per month
  3. PM-JANMAN achievement: 3,47,424 houses sanctioned, 70,905 completed

Technological Innovations:

  1. Awaas+ 2024 app
  • Assisted surveys
  • Face authentication
  • Aadhaar-based e-KYC
  1. AI/ML Integration
  • Fraud detection
  • House attribute identification
  • Anomaly detection

PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

Achievements:

  1. Total Coverage:
  • 1,62,742 habitations connected
  • 8,28,791 km road length sanctioned
  • 11,955 bridges sanctioned
  1. 2024 Progress:
  • 242 habitations connected
  • 19,606 km roads constructed
  • 3,489 bridges completed
  • Expenditure: ₹17,415 crore

New Developments:

  1. PMGSY-IV launched (2024-25 to 2028-29)
  • Target: 25,000 unconnected habitations
  • Road length: 62,500 km
  • Total outlay: ₹70,125 crore
  1. Green Technologies Used:
  • Waste plastic
  • Cold mix
  • Cell filled concrete
  • Nano technology
  • Jute and coir

Leave a Reply

Your email address will not be published. Required fields are marked *